WORK IN PROGRESS
Building Services
- Cadangan Membina Baru Youth Hub, Muar, Johor
Kementerian Belia dan Sukan - Appointment of M&E Consultant to Extend Office building (2 Storey) Construction at MSM Sg. Buloh for MSM Prai Berhad
- The Improvement of Existing Air-Conditioning and Mechanical Ventilation (ACMV) System and Its Associated Works at KLIA International Airport, Sepang, Selangor for Malaysia Airport Berhad
- Cadangan Membina dan Menyiapkan Dataran, Kemudahan Tempat Letak Kereta dan Kemudahan Berkaitan dan Pusat Rekreasi di Kampong Bharu, Kuala Lumpur
District Cooling System/Cogeneration/Renewable Energy
- Engineering Consultant for Project Bunga Raya 3: Conversion of the Existing 28,800RTH Ice Thermal Energy Storage Tank into Chilled Water Thermal Energy Storage Tank, Retrofitting of the Auxiliary Equipment and Connection to the DCP 1 Plant Existing Chilled Water Installations for Pendinginan Megajana Sdn. Bhd. (PMSB)
- Appointment of Project Management Consultant (PMC) for the Construction and Installation of New 90MT/HR High Pressure Boiler No 3 at MSM Sugar Refinery (Johor) Sdn. Bhd
- Mechanical & Electrical (M&E) Consultant for Solar Project; MRT Kajang and Putrajaya Line
- Provision Of Owner’s Engineer Services for The Proposed Developments of Selco Solar Photovoltaic (PV) Plant at Selected Locations in Selangor