District Cooling & Special Projects

 

Completed district cooling projects undertaken by AHAR Consultants are:

  • District Cooling System and Thermal Energy Storage for Kolej Universiti Islam Malaysia, Nilai, Negeri Sembilan.
    • Project Cost – RM25m
    • Scope –Specialist Design & Built Design Consultant
  • Techno-commercial model for biomass based power plant. Optimisation of engineering design for cost effectiveness.
    • Implementation of 14Mwe SREP Power Plant in Kunak, Sabah.
    • 10MWe SREP Wood Base in Gopeng, Perak.
    • 10 MWe SREP Kinabatangan, Sabah.
    • 30 ton/hr Steam RE Project, Kluang, Johor.
    • 5 MWe SREP Power Plant in Perak.
      Pendinginan Megajana Cyberjaya District Cooling System
  • Technical Due Diligent Report for Pendinginan Megajana Cyberjaya District Cooling System for acquisition by Cyberview Sdn Bhd
    • Scope – Assessment and evaluation on the performance and operation of the DCS plant and expected future expansion program
  • Design & Build New Chiller Plant with Ice Thermal Storage at Hospital UKM Cheras.
    • Project Cost – RM 12 Mil
    • Scope – Design Consultant
  • Design & Build New Chiller Plant with Chilled Water Storage at German Malaysian institute, Bangi.
    • Project Cost – RM 12 Mil
    • Scope – Specialist And Lead Consultant
  • Design Review for Central Utilities Facilities (CUF) Plant for BioXcell (M) Sdn Bhd
    • Project Cost – RM 80 mil
    • Scope – Design Review for Boiler & Steam, Chilled Water, Electrical and Waste Treatment & Biogas
      Systems
  • Design and construction of District Cooling Plant #4 at Core Island Putrajaya for Gas District Cooling (Putrajaya) Sdn Bhd
    • Ultimate capacity – 60,000 RT
    • Chilled water storage capacity – 200,000 RTh
    • Scope : Lead consultant
  • Chilled water capacity planning study for GDC Plant #1, Precinct 1, Putrajaya for GDC(P) Sdn Bhd
    • Project Cost : NA
    • Completion : Dec 2014
  •  
  • EPCC contract for Chilled Water Reticulation Pipework for Parcels 4G7, 4G8, 4G9, 4G10 and 4G11, Core Island Putrajaya for Putrajaya Holdings Sdn Bhd.
    • Project Cost – RM 40 Mil
    • Scope – Design EPCC Consultant
  • Upgrading of Thermal Storage System to 30,000 RTh at Cyberjaya District Cooling Plant, Cyberjaya
    • Project Cost – RM 10 Mil
    • Scope – M&E Design consultant
  • Chilled Water pipe laying for various customers for Pendinginan Megajana in Cyberjaya.
    • Project Cost – RM 5 Mil
    • Scope – M&E Design consultant
  • Automated remote chilled water metering system using GSM at Cyberjaya District Cooling Plant, Cyberjaya
    • Project Cost – RM 200,000
    • Scope – M&E Design consultant
  • Design & Build Centralized Chilled Water Storage using consolidation of existing chiller plants at Universiti Islam Antarabangsa (UIA), Gombak Kuala Lumpur.
    • Project Cost – RM 25 Mil
    • Scope – Specialist And Lead Consultant
  • Chilled Water Capacity Planning Study for Core Island Putrajaya for Gas District Cooling (Putrajaya) Sdn Bhd
    • Project Cost – RM 100 Mil
    • Scope – Lead Consultant in association with FVB Energy Inc. USA.
  • 600mm dia. chilled water pipe laying (500m) at Precinct 5 for GDC(P) Sdn Bhd
    • Project Cost : RM3.5 Mil
    • Completion : June 2014
  • 600mm dia. chilled water pipe laying (700m) for D’Pulze development for Pendinginan Megajana Sdn Bhd
    • Project Cost : RM2.5 Mil
    • Completion : Mac 2014
  • Capacity upgrade and refurbishment of District Cooling Plant GDC Plant #2, Precinct 2, Putrajaya for GDC(P) Sdn Bhd
    • Project Cost : RM 12 Mil
    • Completion : Dec 2016
  • Feasibility Study for GDC Plants’ Power Generation and Chilled Water Consolidation and Rationalization at Putrajaya for GDC(P) Sdn Bhd
    • Project Cost : RM 250 Mil
    • Completion : Sept 2015
  • Design and construction of upgrading work for Phase 2 District Cooling Plant at KL Sentral for Wirazone Sdn Bhd
    • System capacity – 15,000 RT
    • Ice storage capacity – 30,000 RTh
  • Capacity Improvement and Health Check Program for 12 units Steam Absorption Chillers at KLIA DCS Plant for GDC (KLIA) Sdn Bhd
  • Replacement of Eight (8) units Steam Absorption Chillers at DCS Plant KLIA Airport for GDC (KLIA) Sdn Bhd
    • Project Cost : RM30 Mil
    • Completion : Nov 2014
  • Upgrading of automated control system at KLIA District Cooling Plant at KLIA Airport for GDC (KLIA) Sdn Bhd